Ελληνικά
               80002244   ΚΕΝΤΡΟ ΑΝΑΦΟΡΑΣ ΒΛΑΒΩΝ
     
Contact Us
Αναζήτηση
Go
About us
Director
Mission
History
Personnel
Legislation
WDD School Activities
Tenders / Public Contracts
Tenders
International Affiliations
Water Resources
General
Water Balance
Groundwater Bodies
Aquifers
Groundwater Bodies (WFD)
Qualitative and quantitative
status of groundwater
Monitoring of spring yield
Protection zones for water supply boreholes
Rivers / Streams
General
Management and protection of
rivers / streams
Riparian-zone restoration of streams
Qualitative status of rivers/streams
Hydrological and Hydraulic Studies -
Minimum requirements
Floods
Dams and Off Stream Ponds
Catalogue of reservoirs
Reservoir storage
Statistical information
Dam monitoring
Catalogue of Qualified Engineers
Qualitative status of water reservoirs
Protection zones for drinking -
water supply reservoirs (dam)
Water Sports
Natural Lakes - Salt Lakes
Qualitative status of Natural Lakes - Salt Lakes
Water Resources
National Monitoring Programmes
Monitoring Programmes
(Water Framework Directive 2000/60/ΕΚ)
Desalination Plants
Recycled Water
Water Development and Management
Brief history
Water Policy
Planning
Drought indices (Drought Management Plant)
Water management
Water allocation
Water pricing
Water saving measures
Water analyses of Governmental
Water Works
Governmental Water Works
Governmental Water Supply Systems
Non Governmental Water Works
Water Supply boundaries
Geographical Information (GIS)
European Matters
Water Framework Directive (2000/60/EC)
Floods Directive (2007/60/EC)
Waste Water Directive (91/271/EEC)
Regulation (EU) 2020/741 on Water Reuse
Solid Waste Management
Co-finance by the European Union
General
Period 2007-2013
Period 2014-2020
Period 2021-2027
Press Room
Announcements
Events
World Water Day
Conferences / Seminars
Public Consultation
Activities
Publications
Studies / Presentations
Booklets
Leaflets
Annual Reports
Galleries
Photos
Multimedia
Digital Data
Vacancies
Publication Plan
Links
Public Services
Governmental Water Works
Paphos GWW
Home Page
/ / Water Development and Management / Governmental Water Works / Paphos GWW
The basic objective of the Pafos Irrigation Project is the development of the water resources of the Pafos district for the irrigation of the coastal plain of Pafos between Chapotami river and Agios Georgios Pegias.
The project started in 1976 and was completed in 1982 at a total cost of C£25 million. It includes the construction of Asprokremmos dam on Xeropotamos river, the main canal and the western main conveyor, pumping stations, reservoirs, irrigation networks and borehole schemes.
Furthermore land consolidation has been applied on an area of about 45% of the total irrigated area, rural roads have been constructed and the Pafos Agricultural Training Centre has been established for the training of farmers, mainly on matters of irrigated agriculture
More information for the project you can find in the
Booklets
PAFOS IRRIGATION PLAN
Asprokremmos Dam
Irrigation area
Project Data
Water Resources
Asprokremmos dam with a capacity of
52,38
MCM
24 boreholes along river aquifers
10,00
MCM
Coastal aquifer boreholes
4,00
MCM
Irrigated area
5 000
hectares
Back to the previous page
Back To Top